About

Plastic chair molds are a common molding machine in the industry, so we must pay attention to its quality when manufacturing Plastic chair molds. To control the quality of Plastic chair molds, we must control the following five aspects.

1. Maintain the consistency and integrity of plastic mold drawings, processing technology, and physical data: through effective, meticulous, and strict testing methods, ensure the consistency and integrity of mold drawings, processing technology, and physical data .
  
2. The plastic mold should have product data management, process data management, drawing and document management, which can ensure the comprehensiveness of the files and the consistency of the drawing versions; so that the drawings can achieve effective sharing and effective query and utilization. A complete computer database for document management can be established, and a large number of design drawings accumulated in the design department, scattered, and previously scattered and isolated information can be collected and used together to prevent the 2d and 3d confusion due to design drawings, original, design changes, The maintenance version is chaotic, the 3D model and the 2D drawing data are inconsistent, and the 2D drawing design is not standardized and chaotic, causing problems that are not easy to be found and corrected in time, causing the plastic mold to be modified and reworked, or even scrapped, increasing the manufacturing cost of plastic mold , Lengthen the production cycle of mold manufacturing and affect the progress.
 
3. Formulate a complete plastic mold production management system to realize the computer information management system of mold product data management, process data management, plan management, and schedule management in the production management process, including mold production plan formulation and mold design , Process formulation, workshop task assignment and product inspection, warehouse management, etc., so that plastic mold manufacturing and related auxiliary information from plan formulation to completion and delivery can achieve a full range of tracking management.
 
4.Organize and integrate the information of planning, design, processing technology, workshop production situation, human resources, etc. organically, so as to effectively coordinate the planning and production, and effectively guarantee the quality of Plastic chair molds and deliver on time.